Industrial construction.

Warehouses, distribution centres, manufacturing plants and logistics facilities. We build the enclosure around the operation that has to run inside it, and we start from the operation, not from the building.

A completed distribution centre with loading docks and an empty hardstand, illustrative of the building type
Project capacity under a single contract
$20m
States we build in: South Australia, Victoria and New South Wales
3
Years the director has been delivering commercial and industrial projects
15+
Every instruction priced, recorded and approved in writing
100%

The premise

An industrial building is specified by what goes inside it.

The racking supplier writes half the slab specification. The stored goods write the sprinkler design. The forklift fleet writes the clear height. Get those inputs late and the building is already wrong.

A warehouse looks like the simplest building on a construction schedule. Portal frame, sheeting, a slab, a few roller shutters. That reading is what produces the industrial projects that finish on time and then do not work. The racking that cannot be installed to the design height, the very narrow aisle truck that will not track, the certifier who will not sign off because the commodity being stored is not the commodity the sprinkler system was designed for.

The building is the easy part. The specification is the project. So we run the operational questions first, in the order below, and we do not let design proceed past the point where an answer is still missing.

What the operation does → what that fixes in the building

  1. Racking supplier and rack type

    Very narrow aisle, reach, drive-in

    sets

    Floor flatness class and joint layout

    Fixed at the pour. Not adjustable after.

  2. Stored commodity and rack height

    Classification, packaging, aerosols

    sets

    Sprinkler system and water supply

    In-rack or ceiling-only, tank and pump

  3. Materials handling fleet

    Lift height, turning circle, wheel load

    sets

    Clear height, column grid, floor loading

    Drives the steel, fabricated off drawings

  4. Truck fleet and throughput

    Rigid, semi-trailer, B-double

    sets

    Dock height, leveller type, apron depth

    Pits are formed in the slab

Four operational decisions, and the building element each one fixes. None of these are builder decisions. They belong to the operator, the racking supplier, the fire engineer and the transport plan. Our job is to get them answered before the element they control is committed.

Clear height

Clear height is not the height of the building.

It is the distance from the finished floor to the underside of the lowest thing above it, and by the time the sprinkler clearance and the services zone have taken their share, the number that matters to a tenant. How high they can stack. Is well below the number on the elevation.

This is the most common single source of late-stage disappointment on a warehouse. A duct run that was never coordinated drops 400 mm into the void, and a rack level goes with it. On a facility sized around pallet positions, a lost rack level is a commercial loss for the life of the lease.

  1. Underside of rafter or haunch

  2. Services, ducts and high-bay lighting

    Coordinated, or it eats the rack

  3. Clearance to sprinkler deflector

    Set by the sprinkler standard, not by preference

  4. Top pallet

  5. Rack level 3

  6. Rack level 2

  7. Rack level 1

  8. Finished floor level

  9. Structural clear height

  10. Usable stacking height

    what the tenant actually pays for

The structural clear height is what the steel gives you. The usable stacking height is what is left after the sprinkler clearance and the services zone are deducted. We coordinate the services zone against the rack elevation before the steel is detailed, not after it is erected.

The slab is the one element on an industrial project that cannot be corrected later.

The empty interior of a completed high-bay warehouse, illustrative of the building type

Sequence

Who sets what, and the point after which it costs real money.

This is the table we work to. It is not a risk register for show; it is the order in which we chase answers, and the reason we ask uncomfortable questions early.

ItemSet byLocked beforeIf it moves after that
Floor flatness class and joint layoutThe racking supplier, from the truck type. Very narrow aisle tolerances are far tighter than counterbalanceThe slab pourGrinding, or a floor that fails the rack installer’s survey. There is no third option.
Sprinkler design and water supplyThe fire engineer and hydraulic consultant, against the commodity classification and the rack configurationRoof structure and pipework fabricationIn-rack pipework, and sometimes the tank and pump. Occasionally the roof.
Clear height and column gridThe materials handling fleet and the rack layoutStructural steel detailingSteel is fabricated off shop drawings. A change is a re-fabrication, not a site variation.
Dock height, leveller type and apron depthThe trailer mix. Rigid, semi-trailer or B-double, and the turning pathSlab set-out and pit formworkPits are cast into the slab. Changing one is demolition.
Incoming supply and main switchboardThe connected load, then the electricity distributor’s response to the applicationAs early as the load can be estimated, ideally before tender awardEnergisation delays practical completion more often than the building does.
Dangerous goods separationThe goods themselves, the relevant standard, the fire engineer and the environmental regulatorConcept design, not detail designSeparation distances move walls and can move the building on the site.

Lead times are market-dependent and are confirmed with each supplier at tender, then carried on the procurement schedule and reported monthly. We do not publish indicative lead times we would then be held to.

Fire and the commodity

The sprinkler system protects a commodity, not a building.

Sprinkler design for racked storage is driven by what is stored, how high, in what packaging, and in what rack configuration. Change any of those and the design basis changes with it. A ceiling-only system suited to one classification may require in-rack sprinklers for another, and in-rack pipework is not something you retrofit into a live, fully racked warehouse without emptying it.

The consequence reaches past construction. A tenant who changes what they store. Or stacks a level higher than the design assumed. Can invalidate the basis of the system that the building was certified on. We write the design basis into the handover documentation in plain language, so the operations team inherits a constraint they can actually see.

What we control

The four things we hold on every industrial project.

  • The slab

    Flatness class, joint layout and point loads coordinated to the racking supplier before the pour, because there is no second pour.

  • The fire design

    Sprinkler basis tied to the actual commodity and rack configuration, written into handover so operations inherit a constraint they can see.

  • The supply

    Connected load estimated early and lodged early, because energisation sets practical completion more often than the building does.

  • The yard

    Dock height, leveller type, apron depth and pavement design set by the actual fleet rather than by a standard detail.

The other services

Power is usually the critical path. It is almost never on the drawings early enough.

Incoming supply
Connected load has to be estimated before anyone can lodge with the electricity distributor, and the distributor’s response time is outside everyone’s control. On a facility with refrigeration, automation or a charging fleet, this is the item most likely to sit on the critical path from day one.
Switchboards
Main and distribution boards are fabricated to order. The design has to be frozen well before anyone wants to freeze it, which is why we take the load schedule seriously at concept rather than treating it as a detail-design problem.
Forklift and fleet charging
An electric MHE fleet is a substantial and often overlooked load, with ventilation and separation requirements of its own. It belongs in the load schedule at concept, next to the racking layout that fixes where the charging bay can go.
Roof-mounted generation
If solar is contemplated at any point in the building’s life, the structural allowance is cheap now and expensive later. We ask the question even when the answer is no, and we record the answer.
Compressed air, process and trade waste
Manufacturing tenancies bring services that a distribution warehouse does not. Trade waste in particular runs through a separate approval with the water authority and does not follow the building approval timeline.

Docks and hardstand

The yard fails before the building does.

Dock height is set by the trailer mix, and a fleet that mixes rigids with semi-trailers needs either adjustable levellers or a decision about which vehicle is inconvenienced. Apron depth is set by the turning path of the largest vehicle, checked with a swept-path analysis rather than by eye. Pavement design is set by wheel loads and by whether laden containers will be set down on it. A point-loaded container corner is a different design problem from a passing truck.

And the falls have to work. A hardstand that ponds is a slip and a stormwater problem at once, and the fix after the fact is a saw cut and a re-pour across the area that matters most to daily operations.

Live facilities

Building inside an operation that cannot stop.

Most industrial work is not a greenfield warehouse. It is an extension, a re-racking, a new dock or a plant replacement inside a facility that is still despatching every day.

  • Separation, physicallyHoarding, dedicated site access and a fixed boundary that site personnel and forklift operators can both see. Not a line on a plan.
  • Traffic management written with the operatorForklift routes, pedestrian paths and delivery windows are the operator’s knowledge. We write the plan with them and re-issue it whenever the work front moves.
  • Isolations booked, not assumedEvery service isolation is scheduled with operations, with a nominated person on each side and a written permit. Unplanned isolation is how a construction programme becomes a production loss.
  • Hot works under permitIn a building with combustible stock, hot works is the highest-consequence activity on site. Permit, watch, and a stand-down period after.
  • Fire systems never silently impairedIf a sprinkler or detection zone must be isolated, it is recorded, time-bounded, and the operator’s fire safety adviser knows before it happens.
  • Out-of-hours where it is genuinely cheaperNight and weekend work costs more per hour and less per day of disruption. We price both and let the operator choose on the numbers rather than on the assumption.

What we build

Four ways into an industrial project.

  • A newly completed greenfield warehouse with a corner office, illustrative of the building type

    New builds

    Greenfield warehouses, distribution centres and manufacturing facilities, from slab and portal frame to a certified, energised, operational building.

  • The empty interior of a completed high-bay warehouse, illustrative of the building type

    Design and construction

    One contract carrying design and delivery, with the operational inputs resolved before design is committed rather than discovered during it.

  • A completed mezzanine office inside a warehouse, illustrative of the building type

    Fitout and refurbishment

    Warehouse office and amenities, re-racking, dock upgrades, plant rooms and cold storage inside facilities that keep operating.

  • An empty commercial tenancy stripped back to base building, illustrative of the building type

    End of lease defit

    Industrial make-good is a different problem from office make-good: floor coatings, racking removal, plinths, bunding and services left behind by the process that used them.

Australian context

Three states, three sets of rules, one standard of delivery.

South Australia
Our home base, and where the JCGAU builder licence sits. Development approval, building rules consent and the interaction with the local council are familiar ground.
Victoria
Building surveyor appointment, occupancy permits and the Victorian variations to the National Construction Code. Where a project attracts state investment, Local Jobs First reporting can apply and is built into the programme rather than bolted on at the end.
New South Wales
Design and Building Practitioners obligations, declared designs and the registration requirements that follow from them. The compliance regime is heavier than the other two states and it changes what has to happen before, not after, construction starts.
Local content and Aboriginal participation
Government and institutional clients increasingly set local content, apprenticeship and Aboriginal business participation targets. These are contract deliverables with reporting attached. We treat them as programme items with named owners, because a target discovered at practical completion is a target already missed.
Australian-owned, Australian-run
JCGAU is an Australian company with people on the ground in all three states. The people who price your project are the people who run it.

Working with us

What we ask for at first contact.

None of this needs to be finished. It needs to exist well enough for us to tell you where the risk actually sits, which is a more useful first conversation than a number.

  • The operation, in one paragraphWhat is stored or made, how it moves, and how much of it there is.
  • The materials handling fleet, current and intendedIncluding whether the fleet is expected to change within the lease term.
  • The racking layout, or the supplier’s nameEven a sketch. The supplier’s tolerance requirements are the ones that matter.
  • The vehicles that will come to siteThe largest one, and how many an hour at peak.
  • Any dangerous goods, in any quantityIncluding what is stored transiently. This changes the building, not the detail.
  • The site, and what is already on itExisting services, contamination history, easements and the survey if one exists.

Projects

Prior firm: the director’s contribution at a previous firm, not JCGAU-delivered work.

Questions

Do you build the shell, or fit out inside an existing one?

Both. A greenfield facility and a re-rack inside a live distribution centre are different projects with different risks, and we scope them differently, but they are the same capability.

Can the facility keep running while you work?

Usually, yes, and it is the normal case rather than the exception. It requires separation, a traffic management plan written with your operations team, and honest pricing of out-of-hours work. We will tell you when it is cheaper to stop than to work around.

Who holds the racking design?

Ordinarily the racking supplier, under a separate supply and install contract with the owner or tenant. We coordinate to it. The slab, the sprinklers and the clear height all depend on it, and we will say so plainly if the design is not yet firm enough to build to.

What delays industrial projects most often?

Electrical supply and long-lead switchgear, followed by late changes to the racking layout. Both are visible from the first week if anyone is looking, which is why we ask about them before we ask about finishes.

Will you work with our preferred racking, MHE or automation supplier?

Yes. On a facility built around specific equipment, the equipment supplier is often the more important relationship. We coordinate to their requirements and hold them to their dates in the same way we hold our own trades.

What size projects do you take?

Up to $20 million under a single contract. Above that we would tell you so rather than take the work and manage it thinly.

Bring us the operation, not the drawings.

The most useful first conversation is about what has to happen inside the building. Send a brief, a sketch, or a description. We will tell you where the risk is before anyone prices anything.